Aug14Week

Done

  • Meeting with Julien Fierz ( New requirements defined, Report outline defined)
  • Reviewer comments for journal paper
  • Registration SoftVis
  • Preparation Koreferat

TO DO

  • Finish administration for Koreferat
  • book Brighton trip for SoftVis
  • Prepare for JF (send format for MSE) - check about presentation of tool

Ongoing

  • ESE Case studies (Working on experiment to correlate features and developers) (send requirements to Paul N)
  • Piece-Wise Linear segmentation algorithm
  • DynaMoose (Mondrian Implementation)
  • DynaMoose Mondrian extensions
  • Mouse over suggestion for mondrian
  • Prepare presentation for SoftVis
  • chapter 3,4 of thesis

Thesis

  • have stuck in all the papers
  • Need to generate feature relationships for both case studies (Mondrian scatterplot)
  • need to produce method views for SmallWiki
  • need to formulate the formulas for relationships
  • write about clustering technique

JIP

Have modified run target (argouml) to include profiling agent

News

Last changed by admin on 21 April 2009